Estimating and Costing MCQ Questions
Take Estimating and Costing MCQ Test & Online Quiz to test your Knowledge
Below is the Estimating and Costing MCQ test that checks your basic knowledge of Estimating and Costing. This Estimating and Costing MCQ Test contains 20 Multiple Choice Questions. You have to select the right answer to the question. Finally, you can also take the Online Quiz from the Take Estimating and Costing Quiz Button.
Estimating and Costing MCQ Test
1) The order of booking dimensions is
2) Pick up the item of work not included in the plinth area estimate
3) The item of the brick structure measured in sq.m is
4) The plinth area of a building not includes
5) The measurement is not made in square metres in case of
Download Free : Estimating and Costing MCQ PDF
6) How many bricks are there in 1 square meter?
7) Which is the most correct estimate?
8) Which of the following estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition?
9) Which of the following is the amount provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing the estimate?
10) What is required for preliminary studies of various aspects of a work or project?
11) The cube rate estimate is less accurate as compared to the plinth area estimate as the height of the building is also compared.
12) Which of the following is the most reliable estimate?
13) What is the correct metric unit, while estimating the qualities for the construction of a building?
14) brick walls are measured in sq. m if the thickness of the wall is ......
15) Which of the following statement is correct?
16) The rate of an item of work depends on ............
17) The detention period in a septic tank is assumed
18) The minimum width of a septic tank is taken ....
19) Anti siphonage pipe is connected to ...........
20) The 'centre line method' is specially adopted for estimating the ........