Estimating and Costing MCQ Test

  1. The order of booking dimensions is
  2. Pick up the item of work not included in the plinth area estimate
  3. The item of the brick structure measured in sq.m is
  4. The plinth area of a building not includes
  5. The measurement is not made in square metres in case of
  6. How many bricks are there in 1 square meter?
  7. Which is the most correct estimate?
  8. Which of the following estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition?
  9. Which of the following is the amount provided in the estimate and bill of quantities for some specialized work to be done by a specialized firm; whose details are not known at the time of preparing the estimate?
  10. What is required for preliminary studies of various aspects of a work or project?
  11. The cube rate estimate is less accurate as compared to the plinth area estimate as the height of the building is also compared.
  12. Which of the following is the most reliable estimate?
  13. What is the correct metric unit, while estimating the qualities for the construction of a building?
  14. brick walls are measured in sq. m if the thickness of the wall is ......
Estimating and Costing MCQ

Take Estimating and Costing MCQ Test & Online Quiz to test your Knowledge

Below is the Estimating and Costing MCQ test that checks your basic knowledge of Estimating and Costing. This Estimating and Costing MCQ Test contains 20 Multiple Choice Questions. You have to select the right answer to the question. Finally, you can also take the Online Quiz from the Take Estimating and Costing Quiz Button.

  • Breadth, length, height
  • Length, breadth, height
  • Height, breadth, length
  • None of the above
View Answer
  • Room area
  • Wall thickness
  • Courtyard area
  • Verandah area
View Answer
  • Brick edging
  • Broken glass coping
  • Reinforced brick work
  • Brick work in arches
View Answer
  • Area of stair cover
  • Lift and wall including landing
  • Area of cantilevered porch
  • Lift and wall including landing
View Answer
  • Form works
  • R.C. Chhajja
  • Damp proof course
  • Concrete Jeffries
View Answer
  • Detailed estimate
  • Cube rate estimate
  • Plinth area estimate
  • Preliminary estimate
View Answer
  • Revised estimate
  • Item rate estimate
  • Maintenance estimate
  • Supplementary and revised estimate
View Answer
  • Revised Estimate
  • Abstract Estimate
  • Plinth Area Estimate
  • Supplementary Estimate
View Answer
  • Detailed estimate
  • Cube rate estimate
  • Plinth area estimate
  • Preliminary estimate
View Answer
  • Metre for length
  • Litre for capacity
  • Cubic metre for area
  • Square metres for volume
View Answer
  • In a gully trap, a water seal of 6 to 7.5 cm is provided
  • The grating provided over gully traps is 23 cm square.
  • The gully trap collects waste water from the kitchen, sink, wash basins, etc.
  • The gully trap disconnects the sullage drain from the main drainage system
View Answer
  • Proportion of mortar
  • Proportion of mortar
  • Specifications of materials
  • All of the above
View Answer
  • 20 minutes
  • 25 minutes
  • 30 minutes
  • 35 minutes
View Answer
  • Main soil pipe
  • Top of P trap W.C.
  • Bottom of P trap W.C.
  • Side of water closet.
View Answer
  • Circular buildings
  • Hexagonal buildings
  • Circular, hexagonal and other geometric shapes
  • None of the above
View Answer