Practice below the best Electrical Installation, Estimation, and Costing MCQ Questions test that checks your basic knowledge of Electrical Installation, Estimation, and Costing. This Electrical Installation, Estimation, and Costing MCQ Test contains 20+ Multiple Choice Questions. You have to select the right answer to the question. Finally, you can also download the Electrical Installation, Estimation, and Costing MCQ PDF completely free.

Electrical Installation, Estimation and Costing MCQ Test

1) Name the cable or conductor which connects the distributor to the consumer terminals.

  • A. Service Mains
  • B.Feeders
  • C.Distributor
  • D.None of the above

2) The Most reliable estimate is........

  • A. Preliminary estimate
  • B.Plinth area estimate
  • C.Detailed estimate
  • D.Cube rate estimate

3) The Main factor to be considered while preparing a detailed estimate

  • A. Transportation of materials
  • B.Quantity of the materials
  • C.Availability of materials
  • D.All the above

4) The Main factor to be considered while preparing a detailed estimate

  • A. Transportation of materials
  • B.Quantity of the materials
  • C.Availability of materials
  • D.All the above

5) Cost estimation include(s) the following expenditure(s)

  • A. pattern making
  • B.selling expenses
  • C.tool making
  • D.All of the above

6) The usual spans with R.C.C. poles are............

  • A. 40-50 metres
  • B.60-100 metres
  • C.80-150 meters
  • D.200-300 meters

7) Find the number of strands of ACSR conductor for 3 layer transmission line?

  • A. 10
  • B.17
  • C.19
  • D.27

8) The Meausrement is made in square metre in cas .................

  • A. Cement concrete in foundation
  • B.R.C.C. structure
  • C.Hollow concrete block wall
  • D.None of these

9) The operating voltage of Extra high tension cable is upto............

  • A. 11 kV
  • B.33 kV
  • C.66 kV
  • D.Above 66 kV

10) Which of the following are the constants of the transmission lines?

  • A. Conductance
  • B.Inductance
  • C.Resistance
  • D.All of the above

11) ...............costing is a type of job costing.

  • A. Operating
  • B.Unit
  • C.Batch
  • D.Multiple

12) The following materials are not used for the transmission and distribution of electrical power?

  • A. Copper
  • B.Tungsten
  • C.Aluminum
  • D.Steel

13) The distributors for residential areas are.............

  • A. Three-phase four-wire
  • B.Three-phase three-wire
  • C.Single-phase
  • D.None of the above

14) A 3-phase 4 wire system is commonly used on.............

  • A. Primary transmission
  • B.Primary distribution
  • C.Secondary transmission
  • D.Secondary distribution

15) The following is also known as overhead costs or on costs.

  • A. Indirect expenses
  • B.Direct expenses
  • C.Cost of indirect labour
  • D.Cost of direct labour