Posted On: Nov 19, 2020
Collapsed Slump: The ratio of water to cement is too high. It indicates the batch will not repair at the designed compressive strength
Shear Slump: It indicates the poor durability of concrete at 28 days. It further goes for a trial to test the cohesion of the mixture
Never Miss an Articles from us.
OSHA aka “Occupational Safety and Health Administration” is a US-based agency of labour that originally has the power to examine the workplaces. The main aim of the OSHA is to ensure the s...
Projection lines are the lines that help in 2D drawing. It is used to create new geometry and the constraints will remain active if the projection lines are off....
The various steps are:Batching: Batching is the measurement of the different material that is needed to make the concrete. Batching can be done with two methods, the first is Volume batching and t...